Since the early 1990s, our company has been at the forefront of energy-saving retrofit for domestic turbines, applying the Full Three-dimensional technology to turbine steam path design. In October 1996, we completed the first domestic 200MW turbine steam path retrofit design and received national certificate.
Runh TG has refurbished hundreds of various models of old turbines, including 500 MW, 300 MW, 200 MW, 125 MW, and 100 MW, using Runh TG technology. After refurbishment and/or retrofit, thermal performance of the units has reached international advanced level.